operator
TeraWulf Inc.
DataCentersExposed tracks 6 data centers operated by TeraWulf Inc. across 4 states, of which 5 are proposed or under construction, with 2.4 GW of reported power capacity.
Owner-developer (Nasdaq: WULF) of the Lake Mariner campus on a retired New York coal-plant site; pivoted from Bitcoin mining to AI hosting, with Fluidstack and Google as anchors.
Reporting by Eric Keller
Facilities
6
tracked
States
4
footprint
Pipeline
5
proposed / building
Reported power
2.4 GW
6 facilities
Where TeraWulf Inc. builds
| Facility | Location | Status | MW |
|---|---|---|---|
| Muskie Data Campus Data Center | Ashland, KY | Proposed | 500 |
| TeraWulf Data Center | Newburg, MD | Proposed | 500 |
| TeraWulf Data Center | Hawesville, KY | Proposed | 480 |
| Lake Hawkeye Data Center | Lansing, NY | Proposed | 150 |
| TeraWulf Abernathy | Abernathy, TX | Under construction | 240 |
| Fluidstack Lake Mariner | BARKER, NY | 500 |