Mapped (unverified)colocation
ITGate PdF (TRN1/TRN2)
Turin, Piemonte, Italy
Source: Primary source
ITGate PdF (TRN1/TRN2) is a mapped data center in Piemonte, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Piemonte
Overview
source: linkIT.Gate — colocation facility (25 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Data center: il volto materiale dell’intelligenza artificiale. Dibattito martedì 18 agosto alla festa di Radio Onda d’UrtoInfoaut· Aug 17, 2026
- Una parte di Lucento si mobilita contro il nuovo Data Center nell'ex BonafousTorino Oggi· Jul 23, 2026
- Remington: lo storico stabilimento di Ilion diventerà un data centerArmi e Tiro· Jul 14, 2026
- L’Università di Torino protagonista della cooperazione tra Italia e Africa per l’intelligenza artificiale sostenibileotto.unito.it· Jun 16, 2026
- Aruba Lavora con noi: posizioni aperte e come candidarsiTi Consiglio· Jun 9, 2026
- AMD chiude in rialzo del 7,80% raggiungendo un nuovo massimo storico; capacità di produzione dei processori EPYC Turin esaurita, carenza di CPU aggravata nell’era degli agenti AIBitget· Apr 17, 2026