DC Noovle Cebrosa
Piemonte, Italy
Source: OpenStreetMap
DC Noovle Cebrosa is a mapped data center in Piemonte, Italy, operated by Noovle S.p.A. DataCentersExposed has documented a 53,738 sq ft footprint at this site. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkDC Noovle Cebrosa is a mapped data center in Italy operated by Noovle S.p.A. Available records put its footprint at 53,738 square feet. Ownership above Noovle S.p.A. is not detailed in the facts on file.
Operator chain
- Ultimate parentNoovle S.p.A
- Files asNoovle S.p.A
- This facilityDC Noovle Cebrosa
The grid behind this site
source: Ember · EurostatA large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Campus Data Center TIM sulla Pontina, riparte l’iter dopo lo stop del Comune di Pomezia: il problema del rumoreIl Caffe· Dec 22, 2025
- Colpo di scena a Pomezia, pochi giorni dopo l'ok arriva lo stop sul Campus Data Center: “Fa troppo rumore”Il Caffe· Oct 21, 2025
- La TIM continua a puntare su Pomezia: potenziato il Campus Data Center sulla Pontina, arrivano le autorizzazioniIl Caffe· Oct 14, 2025
- Data center, in Italia ce ne sono già 153. Ecco la lista a Roma e MilanoKey4biz· Dec 16, 2024
- Nulli, Noovle: “AI e IoT cruciali per massimizzare il valore del cloud”CorCom· May 27, 2021
- Da Noovle a Gaia X. Viaggio verso il cloud con Paolo VannuzziFormiche.net· Apr 9, 2021