Skip to content
DataCentersExposed
Mapped (unverified)colocation

COLT Datacenter Turin

Turin, Piemonte, Italy

Source: Primary source

COLT Datacenter Turin is a mapped data center in Piemonte, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Operator
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Piemonte
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.