Greenfield
Centre-Val de Loire, France
Source: OpenStreetMap
Greenfield is a mapped data center in Centre-Val de Loire, France, operated by Crédit Agricole. DataCentersExposed has documented a 141,249 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkGreenfield is a mapped data center in France operated by Crédit Agricole. Public records describe it as a Crédit Agricole data center with a reported footprint of 141,249 square feet. No corporate parent above Crédit Agricole is listed in available records.
Operator chain
- Ultimate parentCrédit Agricole
- Files asCrédit Agricole
- This facilityGreenfield
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Amundi met en place deux ETF sur les puces mémoire et les centres de donnéesL'Agefi· Jul 23, 2026
- Un long conseil municipal avec en toile de fond le Data Center et le bâtiment de La Poste aux Pennes-MirabeauLa Provence· May 3, 2026
- Equans accélère ses projets industriels et énergétiques en Auvergne-Rhône-AlpesLyon Entreprises [LE]· Apr 28, 2026
- Gide conseille Mistral AI dans le cadre de son premier financement d'un montant de c. 830 millions de dollars américains afin d'opérer un data center en région parisienne à Bruyères-le-ChâtelLe Monde du Droit· Apr 3, 2026
- Mistral AI décroche 830 millions de dollars de financement pour son infrastructure IASiècle Digital· Mar 31, 2026
- Mistral AI s'Endette de 830 M$ pour l'IA en France [2026]tech-insider.org· Mar 31, 2026