Mapped (unverified)colocation
Datacenter Cyrès
Tours, Centre-Val de Loire, France
Source: Primary source
Datacenter Cyrès is a mapped data center in Centre-Val de Loire, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Centre-Val de Loire
Overview
source: linkWEBINDUSTRIE — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Foncier, électricité, puces : Nvidia structure le plus grand data center IA des États-Unis pour OpenAIZDNET· Aug 18, 2026
- Consommation eau des data center : tout comprendreHellio· Aug 17, 2026
- Strasbourg. La première ferme aéroponique d’Alsace pousse au pied d’un data centerdna.fr· Jul 21, 2026
- Equinix obtient le permis de construire pour un méga data center à Amsterdam, mais devra se montrer patient…DCmag· Jul 10, 2026
- Voisins d’un centre de données Microsoft, des Américains se plaignent du bruit et poursuivent l’entrepriseOuest-France· Jul 8, 2026
- Nvidia entraîne le data center vers le « warm water » à 45°DCmag· Jul 8, 2026
See something wrong or missing on this page? Suggest a correction.