Mapped (unverified)colocation
Datacenter Cyrès
Tours, Centre-Val de Loire, France
Source: Primary source
Datacenter Cyrès is a mapped data center in Centre-Val de Loire, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Centre-Val de Loire
Overview
source: linkWEBINDUSTRIE — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Intelligence artificielle : qu'est-ce qu'un «Toxic Tour» qui vise samedi un projet de méga-data center à Valence ?CNews· Oct 10, 2026
- “Les centres de données ont perdu leur légitimité sociale” : après l’Irlande, au tour de l’Écosse de bannir les datacenters. Bientôt la FranceLes Numériques· Oct 9, 2026
- Dans l’Indre, le projet de data center géant de Google provoque une levée de boucliersMediapart· Oct 8, 2026
- Deepseek vise 12 à 15 Md$ avec CATL et TencentBrief IA· Oct 6, 2026
- « Un modèle reproductible ». En Normandie, il a installé un data center dans sa caveOuest-France· Oct 6, 2026
- Centre de données IA en France : vendre ses terres agricoles, promesse, SAFER et prix (2026)Kohen Avocats· Oct 4, 2026
See something wrong or missing on this page? Suggest a correction.