Castle IT
Larçay, Centre-Val de Loire, France
Source: OpenStreetMap
Castle IT is an operating data center in Centre-Val de Loire, France. DataCentersExposed has documented a 14,042 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Footprint
14,042 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Centre-Val de Loire
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Castle IT ouvre un deuxième data center à Saint-Omer (Pas-de-Calais)DCmag· Oct 3, 2026
- Castle IT, le centre de données fortifié d’Indre-et-Loire, ouvre un deuxième site dans le Pas-de-Calaislanouvellerepublique.fr· Sep 17, 2026
- "Ne pas attirer les regards" : La cybersécurité, un sujet sensible et des victimes prudentes en Indre-et-Loirelanouvellerepublique.fr· Sep 15, 2026
- En Indre-et-Loire, Atlas et la Mission locale de Touraine veulent encourager la féminisation des métiers du numériquelanouvellerepublique.fr· Mar 4, 2026
- Castle IT, le centre de données fortifié tourangeau veut se déployer à travers le payslanouvellerepublique.fr· Dec 20, 2025
- Indre-et-Loire : face aux pirates et leurs cyberattaques, des entreprises mal protégées ?lanouvellerepublique.fr· Feb 27, 2025
See something wrong or missing on this page? Suggest a correction.