Google Jackson County Data Center is a mapped data center in Jackson County, AL, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 144,996 sq ft footprint at this site.

Reporting by · Updated Jun 12, 2026

Real parent
Alphabet Inc.
Operator
Google LLC
Est. capacity
~25-60 MW
Footprint
144,996 sq ft
Utility
North Alabama Electric Coop
Grid
TVA
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Google LLC data center

Operator chain

Data-center discussions in Jackson County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Jackson County Committee
Dec 11, 2017 · 1 data-center mention
Jackson County Committee
Aug 14, 2017 · 1 data-center mention
Jackson County Committee
Oct 10, 2016 · 1 data-center mention

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $31.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286
    Ellis County, TX · granted 2024 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346
    Ellis County, TX · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2018 · term yr · source

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Bridgeport Elementary School in Bridgeport, is 2.4 mi from this site (174 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.