Google Datacenter - Douglas County

Douglas County, GA

Source: OpenStreetMap

Google Datacenter - Douglas County is a mapped data center in Douglas County, GA, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 2,608,503 sq ft footprint at this site.

Reporting by · Updated Jun 12, 2026

Real parent
Alphabet Inc.
Operator
Google LLC
Footprint
2,608,503 sq ft
Utility
Greystone Power Corporation
Grid
SOCO
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Google data center

Operator chain

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $31.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286
    Ellis County, TX · granted 2024 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346
    Ellis County, TX · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2018 · term yr · source
Statewide cost of this incentive

Georgia reported $474.2M in High-Technology Data Center Equipment Sales and Use Tax Exemption (O.C.G.A. § 48-8-3(68.1)) for FY2025 (Georgia Department of Audits and Accounts (DOAA); economic analysis by UGA Carl Vinson Institute of Government). Program-wide, not attributable to this site.

source · All Georgia subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Riverside Elementary School in Mableton, is 2.8 mi from this site (559 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.