Gen01 is an operating data center in Genève, Switzerland, operated by Stack Infrastructure, Inc.. It runs on Switzerland's grid, which was 2% fossil-fuelled at 39 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Stack Infrastructure, Inc.
Operator
Stack Infrastructure, Inc.
Grid carbon
39 gCO₂/kWh
Clean electricity
98%
Region
Genève
Overview
source: linkGEN01 is a mapped data center in Plan-les-Ouates, Switzerland, run by Stack Infrastructure, Inc. Available records identify it as a Stack Infrastructure data center but disclose no further operational detail. Its ultimate ownership, capacity, and operational status are not specified in the verified facts on hand.
Operator chain
- Ultimate parentStack Infrastructure, Inc.
- Files asStack Infrastructure, Inc.
- This facilityGen01
The grid behind this site
source: Ember · EurostatGrid carbon intensity
39 gCO₂/kWh
Clean electricity
98%
Fossil electricity
2%
National grid context, not this facility's own metering. Full country picture: Switzerland data centers.
In the news
source: Google News (local + English)See something wrong or missing on this page? Suggest a correction.