Equinix GV2
Le Lignon, Genève, Switzerland
Source: OpenStreetMap
Equinix GV2 is an operating data center in Genève, Switzerland, operated by Equinix, Inc.. DataCentersExposed has documented a 26,599 sq ft footprint at this site. It runs on Switzerland's grid, which was 2% fossil-fuelled at 39 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Equinix, Inc.
Operator
Equinix, Inc.
Est. capacity
~5-15 MW
Footprint
26,599 sq ft
Grid carbon
39 gCO₂/kWh
Clean electricity
98%
Region
Genève
Overview
source: linkEquinix GV2 is a mapped data center in Le Lignon, Switzerland, run by Equinix, Inc. Available records list a footprint of 26,599 square feet. Beyond its operator and location, the public record on the site remains thin.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix GV2
The grid behind this site
source: Ember · EurostatGrid carbon intensity
39 gCO₂/kWh
Clean electricity
98%
Fossil electricity
2%
National grid context, not this facility's own metering. Full country picture: Switzerland data centers.
In the news
source: Google News (local + English)No recent coverage found for this facility.
See something wrong or missing on this page? Suggest a correction.