fifteenfortyseven CSR ORNY1
1 Ramland Road · Orangeburg, Rockland County, NY
Source: OpenStreetMap
fifteenfortyseven CSR ORNY1 is an operating data center in Rockland County, NY. DataCentersExposed has documented 24 MW of reported power capacity and a 151,516 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkORNY1 is an operating data center in Orangeburg, Rockland County, New York, run by fifteenfortyseven Critical Systems Realty. The site spans a reported 151,516 square feet. It draws power from Orange & Rockland Utilities Inc within the NYIS balancing authority.
The grid behind this site, right now
source: NYISO · gridstatus- Natural Gas68.4%
- Nuclear13.9%
- Hydro8.5%
- Other6.4%
- Wind2.8%
Real-time generation mix for the NYISO grid this site draws from, as of Jul 15, 2026, 10:10 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Data center protests have become a national sport, despite only 8% of opponents actually living near oneFortune· Jun 22, 2026
- Harvard scholar: the data-center backlash is just getting startedFortune· Jun 21, 2026
- Opinion: New York must set the standard for responsible data center developmentCity & State New York· Jun 12, 2026
- This Rockland town is weighing a local data center moratoriumLohud· Jun 11, 2026
- Data Center Moratorium Proposed in OrangetownRockland County Times Newspaper· Jun 11, 2026
- Town of Orangetown Hires Consultant To Study Data Center MoratoriumRockland County Business Journal· Jun 10, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (New York City Region), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Rockland Children's Psychiatric Center in Orangeburg, is 0.9 mi from this site (16 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.