Bloomberg Data Center
155 Corporate Drive · Orangeburg, Rockland County, NY
Source: OpenStreetMap
Bloomberg Data Center is a mapped data center in Rockland County, NY, operated by Prime Data Centers. DataCentersExposed has documented 7 MW of reported power capacity, a 182,539 sq ft footprint and $13.6M in tracked tax abatements at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkBloomberg Data Center is a mapped colocation site in Orangeburg, Rockland County, New York, run by Prime Data Centers. Its reported footprint is 182,539 square feet. The site is served by Orange & Rockland Utilities Inc within the NYIS balancing authority.
Operator chain
- Ultimate parentPrime Data Centers
- Files asPrime Data Centers
- This facilityBloomberg Data Center
The grid behind this site, right now
source: NYISO · gridstatus- Natural Gas68.4%
- Nuclear13.9%
- Hydro8.5%
- Other6.4%
- Wind2.8%
Real-time generation mix for the NYISO grid this site draws from, as of Jul 15, 2026, 10:10 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- New York Data Center Moratorium Faces Growing Business Pushback - Bloomberg Government NewsBloomberg Government News· Jul 6, 2026
- New York Data Center Moratorium Faces Growing Business Pushback - Bloomberg Law NewsBloomberg Law News· Jul 6, 2026
- Oracle Reports Higher-Than-Expected Data Center Spending - BloombergBloomberg· Jun 10, 2026
- New York Lawmakers on Track to Halt Data Center Construction (1) - Bloomberg Law NewsBloomberg Law News· Jun 2, 2026
- New York Lawmakers on Track to Halt Data Center Construction (1) - Bloomberg Government NewsBloomberg Government News· Jun 2, 2026
- Meta Is Transforming Rural Louisiana With a $200 Billion Data Center - BloombergBloomberg· May 18, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77- ConstructionTax break$13,645,139Rockland County Industrial Development Agency, ORANGEBURG, NY · granted 2013 · term — yr · source
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (New York City Region), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Rockland Children's Psychiatric Center in Orangeburg, is 1.2 mi from this site (16 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.