Mapped (unverified)colocation
eStruxture TOR-5
Barrie, Ontario, Canada
Source: Primary source
eStruxture TOR-5 is a mapped data center in Ontario, Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Overview
source: linkeStruxture Data Centers Inc. — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Saskatchewan says new data centres must be Canadian owned, supply their own powerCTV News· Aug 27, 2026
- ‘Much wider than autos, dairy and alcohol’: local tariff expert reacts to failed Canada-U.S. trade dealCTV News· Aug 22, 2026
- Alberta minister faces more fury at second town hall on AI data centresCTV News· Aug 21, 2026
- 'Guys, get informed': Premier finds irony in municipalities not wanting AI data centresBarrieToday.com· Aug 14, 2026
- Dozens protest Meta's plan for massive data centre in northern Alberta countyCTV News· Aug 2, 2026
- Strathroy-Caradoc zoning application revised: Data centre use removed following public backlashCTV News· Jul 31, 2026