Equinix New York Secaucus NY4
755 Secaucus Road · Secaucus, Hudson County, NJ
Source: OpenStreetMap
Equinix New York Secaucus NY4 is an operating data center in Hudson County, NJ, operated by Equinix, Inc.. DataCentersExposed has documented a 317,271 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jul 15, 2026
Overview
source: linkEquinix data center
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix New York Secaucus NY4
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- With AI booming, NJ is a growing data center hub. But what about electric, water use?Bergen Record· Dec 2, 2025
- A new wave of data center demand is coming to New Jersey, but supply may be tighter than everReal Estate NJ· Jun 5, 2024
- NYSE Network Extends to Equinix NJ SiteData Center Knowledge· May 31, 2024
- Closer Look: The Equinix NY4 Data CenterData Center Knowledge· May 31, 2024
- Equinix Opens Secaucus ExpansionData Center Knowledge· May 30, 2024
- Equinix to Host BATS Exchange in Secaucus Trading HubData Center Knowledge· May 30, 2024
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~60 to 130 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Nearest school
source: HIFLD / NCESThe nearest public school, Clarendon School in Secaucus, is 1.0 mi from this site (469 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.