Digital Realty New Jersey EWR10
300 John F. Kennedy Boulevard East · Weehawken, Hudson County, NJ
Source: OpenStreetMap
Digital Realty New Jersey EWR10 is an operating data center in Hudson County, NJ, operated by Digital Realty Trust, Inc.. DataCentersExposed has documented 14 MW of reported power capacity and a 126,960 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkEWR10 is an operating colocation data center in Weehawken, Hudson County, New Jersey, run by Digital Realty Trust, Inc. The site covers a reported 126,960 square feet. It draws power from Public Service Electric and Gas Co inside the PJM grid.
Operator chain
- Ultimate parentDigital Realty Trust, Inc.
- Files asDigital Realty Trust, Inc.
- This facilityDigital Realty New Jersey EWR10
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Wholesale Data Centers Thrive in Central NJData Center Knowledge· May 31, 2024
- Cyxtera Data Center Leases – Who and What is at Risk?Dgtl Infra· Jul 6, 2023
- Landlords Double as Energy Brokers (Published 2013)The New York Times· May 13, 2013
- Inside Ten of the World’s Largest Data CentersSiliconANGLE· Mar 29, 2010
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
14 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (New York City Region), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Hudson Elementary School in Union City, is 0.3 mi from this site (295 students). 16 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.