Mapped (unverified)colocation
Elmec BR4
Brunello, Lombardia, Italy
Source: Primary source
Elmec BR4 is a mapped data center in Lombardia, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Lombardia
Overview
source: linkElmec Informatica SPA — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- A Pietrafitta il data center “sartoriale”il Giornale· Oct 5, 2026
- DigithON, Bio System Lab conquista il primo premio con la pelle umana vascolarizzata stampata in 3DBuonasera24· Oct 5, 2026
- Il data center «umanistico» progettato in Umbria nell'ex centrale da Brunello Cucinelli: «L'AI deve essere un'ancella al nostro servizio»Corriere della Sera· Sep 23, 2026
- Il data center «umanistico» progettato in Umbria dallo stilista Brunello Cucinelli: «L'AI sia un'ancella al nostro servizio»Corriere della Sera· Sep 22, 2026
- Un data center “bello” in Umbria. Cucinelli ci prova nell’ex centrale elettricaAvvenire· Sep 17, 2026
- Brunello Cucinelli sostiene il rilancio dell’ex centrale Enel di PietrafittaIl Sole 24 ORE· Sep 17, 2026
See something wrong or missing on this page? Suggest a correction.