Mapped (unverified)colocation
Elmec BR4
Brunello, Lombardia, Italy
Source: Primary source
Elmec BR4 is a mapped data center in Lombardia, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Lombardia
Overview
source: linkElmec Informatica SPA — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Brunello Cucinelli: ricavi record e nuove assunzioni con il piano di espansione in ItaliaTi Consiglio· Jul 18, 2026
- Elmec, la sostenibilità non è un proclamo: «È quello che siamo»VareseNews· Jun 10, 2026
- STM, riviste le indicazioni sui ricavi per Data CenterSoldiOnline.it· Jun 3, 2026
- Borsa di Milano da record, Piazza Affari sfonda quota 50.400Affaritaliani· Jun 2, 2026
- Data center oggi al centro dell'economia: la Lombardia prima Regione al lavoro per una legge di regolamentazioneVareseNews· May 21, 2026
- Cinquant’anni di ElmecVaresefocus· Apr 14, 2025
See something wrong or missing on this page? Suggest a correction.