Mapped (unverified)colocation
DigiCo Brisbane BNE2 (iseek LDR2)
Eagle Farm, Queensland, Australia
Source: Primary source
DigiCo Brisbane BNE2 (iseek LDR2) is a mapped data center in Queensland, Australia, operated by DigiCo REIT. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
DigiCo REIT
Operator
DigiCo REIT
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Queensland
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkDigiCo — colocation facility (2 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentDigiCo REIT
- Files asDigiCo REIT
- This facilityDigiCo Brisbane BNE2 (iseek LDR2)
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Japan’s Datasection eyes $400m from new AI centre in SydneyAFR· May 20, 2026
- News | HMC Capital puts multiple US data centers on the blockCoStar· May 6, 2026
- New DigiCo CEO appointed, targets AI boom amid energy worriesAFR· Dec 8, 2025
- Australia’s DigiCo Infrastructure REIT signs 14MW of data center dealsData Center Dynamics· Oct 4, 2025
- 3 ASX players with exposure to data centresMorningstar.com.au· Jun 9, 2025
- HMC’s DigiCo REIT acquires State Farm data centers in Texas and Kansas – reportData Center Dynamics· Jan 17, 2025
See something wrong or missing on this page? Suggest a correction.