Mapped (unverified)colocation
Christie Systems DC1
Brisbane, Queensland, Australia
Source: Primary source
Christie Systems DC1 is a mapped data center in Queensland, Australia. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Queensland
Overview
source: linkChristie Systems Services — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Bowen denies NT and Qld 'carve-out' for data centre power sourcesEnergy News Bulletin· Aug 28, 2026
- Qld and NT win fight to use fossil fuels to power data centresEnergy Source & Distribution· Aug 26, 2026
- PM backs down, gives Qld green power exemption for data centreThe Courier Mail· Aug 26, 2026
- Qld’s proposed $32bn AI data centre up in air over state-federal power playThe Courier Mail· Aug 25, 2026
- Zerra DC files plans for large data center campus in Queensland, AustraliaData Center Dynamics· Aug 24, 2026
- International company's plan for multi-billion-dollar data centre in regional QldABC News & Headlines – Australian Broadcasting Corporation· Aug 24, 2026
See something wrong or missing on this page? Suggest a correction.