Mapped (unverified)colocation
AAPT Fortitude Valley
Brisbane, Queensland, Australia
Source: Primary source
AAPT Fortitude Valley is a mapped data center in Queensland, Australia, operated by Vocus. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Vocus
Operator
Vocus
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Queensland
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkVocus Group — colocation facility (1 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Compnow, Vocus and NEXTDC | Delivering Sovereign Transformation at ScaleNEXTDC· Oct 26, 2025
- Dark fibre hotshot FibreconX hunts for $150m; Lazard on ticketAFR· Jan 16, 2025
- Australia Connect to deliver new subsea cablesiTnews· Nov 26, 2024
- Australia's competition watchdog kicks off review of Vocus-TPG fiber dealData Center Dynamics· Nov 20, 2024
- NextDC launches 5MW data center in Adelaide, AustraliaData Center Dynamics· Sep 5, 2024
- First look inside NEXTDC’s $100m Adelaide data centreInDaily South Australia· Sep 3, 2024
See something wrong or missing on this page? Suggest a correction.