Mapped (unverified)
三菱総研dcs
印西市, Chiba, Japan
Source: OpenStreetMap
三菱総研dcs is a mapped data center in Chiba, Japan. DataCentersExposed has documented a 28,110 sq ft footprint at this site. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-15 MW
Footprint
28,110 sq ft
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Chiba
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- 【第6弾】印西市・千葉NT中央駅前データセンター問題 12月建築確認申請の意向~1月にも着工の恐れ Americas Culinary Cup (BgXI0Hl1HD)Fathom Journal· Jun 16, 2026
- 「制度の空白」が生んだ建設ラッシュ DCは「工場・倉庫」か「事務所」か 住民反発に頭悩ます自治体日経ビジネス電子版· Jun 11, 2026
- AIデータセンター、学習・推論で崩れる構図 分散化の波日本経済新聞· Jun 7, 2026
- 北総鉄道・京成電鉄「千葉ニュータウン中央」駅北口近く データセンター「(仮称)Inzai5新築工事」 2026年5月下旬の建設状況東京・大阪 都心上空ヘリコプター遊覧飛行· May 29, 2026
- 流山でも問題になったデータセンター建設問題について。その3。自治体の存在意義を問う!選挙ドットコム· May 18, 2026
- 江東区千石データセンター問題 ―NHK報道で示された「自治体が動くしかない」という結論 - 中島ゆうたろう(ナカジマユウタロウ)選挙ドットコム· May 16, 2026