Mapped (unverified)colocation
Datacenter Arnhem KLW
Arnhem, Gelderland, Netherlands
Source: Primary source
Datacenter Arnhem KLW is a mapped data center in Gelderland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Gelderland
Overview
source: linkDatacenter Arnhem — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Een open dag voor datacenters, tegen datacenter-argwaan. ‘We willen worden gezien als een nutsvoorziening’NRC· Jun 10, 2026
- Brandweer opnieuw naar datacenter Almere, maar dit keer zijn ze snel vertrokkenAD.nl· May 14, 2026
- NL-alert voor grote brand in datacentrum, brandweer probeert overslag vuur te voorkomenDe Gelderlander· May 7, 2026
- Arnhem bewaakt al 30 jaar een cruciaal stuk van het Nederlandse internet, en bijna niemand weet hetDe Gelderlander· May 5, 2026
- TenneT mag datacenteraansluiting uitstellen om vol stroomnetArchitectenweb· May 1, 2026
- Datacenter in Vijfhuizen moet nog negen jaar wachten op stroomaansluiting, boze investeerder vist achter het netHaarlems Dagblad· Apr 30, 2026
See something wrong or missing on this page? Suggest a correction.