Mapped (unverified)
Cellnex
Gelderland, Netherlands
Source: OpenStreetMap
Cellnex is a mapped data center in Gelderland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Gelderland
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Torenbedrijf Cellnex - bekend van de enorme kerstboom langs de A2 - speelt miljardenspel op grote hoogteDe Telegraaf· Mar 6, 2025
- Cellnex vult behoefte van datacenter ruimte zo goed mogelijk inDutch IT Channel· Mar 15, 2022
- BTG en Dutch IT-channel bespreken Cellnex innovatiesDutch IT Channel· Mar 8, 2022
- Cellnex neemt Media Gateway Hilversum overSpreekbuis.nl· Nov 17, 2021
- Het dubbelleven van de televisietorensNRC - Nieuws, achtergronden en onderzoeksjournalistiek· Nov 27, 2020
- Wat gebeurt er achter de dikke muren van de televisietoren?ZuidWest TV· Aug 3, 2020
See something wrong or missing on this page? Suggest a correction.