Mapped (unverified)colocation
Bit-1
Ede, Gelderland, Netherlands
Source: Primary source
Bit-1 is a mapped data center in Gelderland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Gelderland
Overview
source: linkBIT BV — colocation facility (11 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Waarom de ophef over datacenters te makkelijk voorbijgaat aan wat ze opleverenEWmagazine.nl· Jul 25, 2026
- Eén datacenter van Microsoft slurpt evenveel stroom als heel Eindhoven. Hoe kan dat op het toch al volle Nederlandse stroomnet?NRC - Nieuws, achtergronden en onderzoeksjournalistiek· Jul 16, 2026
- Update over de uitbreiding van onze datacentersNorthC Datacenters· Apr 2, 2026
- Kort: Epe meldt cyberinbraak, Twente krijgt fotonica-fabriek (en meer)Computable.nl· Mar 16, 2026
- De AI-race kan niet zonder fotonische chips, en laat Nederland daar nu net in vooroplopenMT/Sprout· Mar 12, 2026
- ASML krijgt grote nieuwe campus in EindhovenTechzine.nl· Mar 11, 2026
See something wrong or missing on this page? Suggest a correction.