Skip to content
DataCentersExposed
Mapped (unverified)

Cyxtera Toronto YYZ2

Markham, Ontario, Canada

Source: OpenStreetMap

Cyxtera Toronto YYZ2 is a mapped data center in Ontario, Canada, operated by Cyxtera. DataCentersExposed has documented a 101,877 sq ft footprint at this site. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Cyxtera
Operator
Cyxtera
Est. capacity
~20-45 MW
Footprint
101,877 sq ft
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
Ontario
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Cyxtera Toronto YYZ2 is a data center in Markham, Canada, operated by Cyxtera. Available records map the site with a footprint of 101,877 square feet. No ultimate parent above Cyxtera is named in the verified facts for this location.

Operator chain

  • Ultimate parent
    Cyxtera
  • Files as
    Cyxtera
  • This facility
    Cyxtera Toronto YYZ2

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%

National grid context, not this facility's own metering. Full country picture: Canada data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.