Anthropic-Amazon New Carlisle

"The largest AI cluster on Earth exists to train one chatbot: Anthropic's Claude."

55001 LARRISON DR, NEW CARLISLE, IN, 46552 · NEW CARLISLE, St. Joseph County, IN

Source: Primary source

Anthropic-Amazon New Carlisle is an operating data center in St. Joseph County, IN, operated by Amazon.com, Inc.. DataCentersExposed has documented 1,092 MW of reported power capacity and $1.9B in tracked tax abatements at this site.

Reporting by · Updated Jun 17, 2026

Real parent
Amazon.com, Inc.
Operator
Amazon.com, Inc.
Power
1,092 MW
Utility
Indiana Michigan Power
Grid
PJM
Attribution & capacity confidence:highprimary source

Overview

source: link

Project Rainier is Amazon's roughly 1,200-acre data-center campus in New Carlisle, Indiana, built for a single purpose: training and running Anthropic's Claude models. AWS activated it in October 2025 with close to 500,000 of Amazon's custom Trainium2 chips across seven buildings, calling it more than five times the compute Anthropic used for its prior models. The full campus is designed for about 2.2 gigawatts, and Amazon has invested roughly $8 billion in Anthropic, which has committed to spending more than $100 billion on AWS.

The bill is landing locally. St. Joseph County granted a 35-year package worth about $4 billion, with roughly $1.9 billion in net savings to Amazon, and state records show Amazon claimed $560.9 million in sales-tax exemptions in 2025 alone. In March 2026, four of five Republican county council members asked Amazon to renegotiate the break.

Power comes from Indiana Michigan Power on a coal-and-gas grid, under an IURC large-load settlement meant to keep costs off existing ratepayers. Water is the live fight: the data center and a neighboring battery plant were granted up to 24 million gallons a day from the Kankakee aquifer, and a separate request to pump 35 million gallons a day to dewater the construction site was tabled by the county over watershed concerns.

Operator chain

Known aliases: Anthropic-Amazon New Carlisle

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.5 mi
Edison · 138 kV
Transmission line
969 ft
line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77
Total reported: $1.9B
  • St. Joseph County data center tax packageTax break$1,900,000,000
    St. Joseph County, IN · granted 2024 · term 35 yr · source

Water use

Modeled estimate~20.5M gpd
Direct (onsite cooling)
~10M gpd
Indirect (its electricity)
~10.5M gpd

No measured record exists, so this is a low-confidence model from 1,092 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
AEP (Ohio / WV / VA) · 2027/28 auction
$333 /MW-day

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost
$132.7M/yr

1,092 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
45
PM2.5
Good
36
O3
Good

Air Quality Index from the nearest AirNow reporting area (South Bend), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$69.1K
People of color
9%
Below poverty
5%
Tract population
4,325

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Olive Township Elementary School in New Carlisle, is 2.8 mi from this site (477 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.