Anthropic-Amazon New Carlisle
"The largest AI cluster on Earth exists to train one chatbot: Anthropic's Claude."
55001 LARRISON DR, NEW CARLISLE, IN, 46552 · NEW CARLISLE, St. Joseph County, IN
Source: Primary source
Anthropic-Amazon New Carlisle is an operating data center in St. Joseph County, IN, operated by Amazon.com, Inc.. DataCentersExposed has documented 1,092 MW of reported power capacity and $1.9B in tracked tax abatements at this site.
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkProject Rainier is Amazon's roughly 1,200-acre data-center campus in New Carlisle, Indiana, built for a single purpose: training and running Anthropic's Claude models. AWS activated it in October 2025 with close to 500,000 of Amazon's custom Trainium2 chips across seven buildings, calling it more than five times the compute Anthropic used for its prior models. The full campus is designed for about 2.2 gigawatts, and Amazon has invested roughly $8 billion in Anthropic, which has committed to spending more than $100 billion on AWS.
The bill is landing locally. St. Joseph County granted a 35-year package worth about $4 billion, with roughly $1.9 billion in net savings to Amazon, and state records show Amazon claimed $560.9 million in sales-tax exemptions in 2025 alone. In March 2026, four of five Republican county council members asked Amazon to renegotiate the break.
Power comes from Indiana Michigan Power on a coal-and-gas grid, under an IURC large-load settlement meant to keep costs off existing ratepayers. Water is the live fight: the data center and a neighboring battery plant were granted up to 24 million gallons a day from the Kankakee aquifer, and a separate request to pump 35 million gallons a day to dewater the construction site was tabled by the county over watershed concerns.
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon.com, Inc.
- This facilityAnthropic-Amazon New Carlisle
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- What Can Other Communities Learn From New Carlisle’s Data Center? - InkFreeNews.comInkFreeNews.com· Jul 20, 2026
- Data center of attention: What can other communities learn from New Carlisle? - The Republic NewsThe Republic News· Jul 17, 2026
- UNCERTAIN FUTURE: New Carlisle offers lessons to other communities as data centers arrive - the indiana citizenthe indiana citizen· Jul 16, 2026
- Data center of attention: What can other communities learn from New Carlisle? - The Statehouse FileThe Statehouse File· Jul 13, 2026
- Data center of attention: What can other communities learn from New Carlisle? - The Statehouse FileThe Statehouse File· Jul 10, 2026
- IDEM hosts public hearing on Amazon Data Center near New Carlisle - WSBTWSBT· Jul 9, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77- St. Joseph County data center tax packageTax break$1,900,000,000St. Joseph County, IN · granted 2024 · term 35 yr · source
Water use
No measured record exists, so this is a low-confidence model from 1,092 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
1,092 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (South Bend), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Olive Township Elementary School in New Carlisle, is 2.8 mi from this site (477 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).