Anthropic-Amazon New Carlisle
55001 LARRISON DR, NEW CARLISLE, IN, 46552 · NEW CARLISLE, St. Joseph County, IN
Source: Primary source
Anthropic-Amazon New Carlisle is a mapped data center in St. Joseph County, IN, operated by Amazon.com, Inc.. DataCentersExposed has documented 1,092 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 13, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkAnthropic-Amazon New Carlisle — frontier AI data center campus tracked by Epoch AI, operated by Amazon. Estimated capital cost ~$34.5B (2025 USD). Located from Epoch AI's Frontier Data Centers dataset (CC-BY 4.0); operational status not independently verified.
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon.com, Inc.
- This facilityAnthropic-Amazon New Carlisle
In the news
source: GDELTTax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Long-Term Rural Enterprise Zone (Morrow County School District 1)$16,668,806Morrow County School District 1, OR · granted 2024 · term — yr · source
Water use
No measured record exists, so this is a low-confidence model from 1,092 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
1,092 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (South Bend), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Olive Township Elementary School in New Carlisle, is 2.8 mi from this site (477 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.