Mapped (unverified)

Amazon AWS Data Center

St. Joseph County, IN

Source: OpenStreetMap

Amazon AWS Data Center is a mapped data center in St. Joseph County, IN, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc..

Reporting by · Updated Jun 14, 2026

Real parent
Amazon.com, Inc.
Operator
Amazon Data Services, Inc.
Utility
Indiana Michigan Power Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source

Overview

source: link

data center

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
2.2 mi
Edison · 138 kV
Transmission line
1.0 mi
345 kV line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
AEP (Ohio / WV / VA) · 2027/28 auction
$333 /MW-day

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
45
PM2.5
Good
36
O3
Good

Air Quality Index from the nearest AirNow reporting area (South Bend), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$69.1K
People of color
9%
Below poverty
5%
Tract population
4,325

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Olive Township Elementary School in New Carlisle, is 3.1 mi from this site (477 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.