Amazon Ridgeland

1626 E COUNTY LINE RD, RIDGELAND, MS, 39157 · RIDGELAND, Madison County, MS

Source: Primary source

Amazon Ridgeland is a mapped data center in Madison County, MS, operated by Amazon.com, Inc.. DataCentersExposed has documented 273 MW of reported power capacity at this site.

Reporting by · Updated Jun 17, 2026

Real parent
Amazon.com, Inc.
Operator
Amazon.com, Inc.
Power
273 MW
Utility
Entergy Mississippi LLC
Grid
MISO
Attribution & capacity confidence:highprimary source

Overview

source: link

Amazon Ridgeland — frontier AI data center campus tracked by Epoch AI, operated by Amazon. Estimated capital cost ~$8.6B (2025 USD). Located from Epoch AI's Frontier Data Centers dataset (CC-BY 4.0); operational status not independently verified.

Operator chain

Known aliases: Amazon Ridgeland

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
30%
Fossil right now
67%
Grid operator
MISO
  • Natural Gas34.4%
  • Coal32.8%
  • Solar15.4%
  • Nuclear10.2%
  • Wind4.1%
  • Other2.2%
  • Imports0.9%

Real-time generation mix for the MISO grid this site draws from, as of Aug 17, 2026, 8:05 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.6 mi
Unknown109660 · 230 kV
Transmission line
0.5 mi
230 kV line
Municipal water
Served
City Of Ridgeland

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~5.7M gpd
Direct (onsite cooling)
~2.8M gpd
Indirect (its electricity)
~2.9M gpd

No measured record exists, so this is a low-confidence model from 273 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
47
PM2.5
Good
44
O3
Good
18
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Jackson), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$49.5K
People of color
76%
Below poverty
18%
Tract population
2,417

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Revive Collegiate in Jackson, is 1.3 mi from this site (154 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.