Amazon Ridgeland
1626 E COUNTY LINE RD, RIDGELAND, MS, 39157 · RIDGELAND, Madison County, MS
Source: Primary source
Amazon Ridgeland is a mapped data center in Madison County, MS, operated by Amazon.com, Inc.. DataCentersExposed has documented 273 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 13, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkAmazon Ridgeland — frontier AI data center campus tracked by Epoch AI, operated by Amazon. Estimated capital cost ~$8.6B (2025 USD). Located from Epoch AI's Frontier Data Centers dataset (CC-BY 4.0); operational status not independently verified.
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon.com, Inc.
- This facilityAmazon Ridgeland
The grid behind this site, right now
source: MISO · gridstatus- Wind21.6%
- Natural Gas21.4%
- Coal20.5%
- Solar18.4%
- Nuclear14.1%
- Imports2.2%
- Other1.8%
Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: GDELTTax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Long-Term Rural Enterprise Zone (Morrow County School District 1)$16,668,806Morrow County School District 1, OR · granted 2024 · term — yr · source
Water use
No measured record exists, so this is a low-confidence model from 273 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Jackson), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Revive Collegiate in Jackson, is 1.3 mi from this site (154 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.