Skip to content
DataCentersExposed
Under constructionhyperscale

AWS Madison Mississippi

Madison County, MS

AWS Madison Mississippi is a under construction data center in Madison County, MS, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented 750 MW of reported power capacity at this site.

Reporting by · Updated Jun 15, 2026

Campaign · Decision pending

Take action

Madison, Mississippi

0
supporters

A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Power & your bill

750 MW of new demand — roughly a city of 600,000 homes.

Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in MS is 16.8¢/kWh, up 10.4% year-over-year. (MW→homes is a rough ~800/MW planning figure.)

Source
Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Amazon.com, Inc.
Operator
Amazon Data Services, Inc.
Power
750 MW
Utility
Yazoo Valley Elec Power Assn
Grid
MISO
Attribution & capacity confidence:mediumprovenance JSON

Overview

$10B disclosed capital investment, state package of incentives.

Operator chain

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
24%
Fossil right now
62%
Grid operator
MISO
  • Natural Gas33.4%
  • Coal28.2%
  • Solar13.1%
  • Imports11.0%
  • Nuclear9.7%
  • Other3.0%
  • Wind1.6%

Real-time generation mix for the MISO grid this site draws from, as of Jul 15, 2026, 9:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
2.8 mi
Unknown109669 · 230 kV
Transmission line
1.3 mi
500 kV line
Municipal water
Served
City Of Canton

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~15.5M gpd
Direct (onsite cooling)
~7.6M gpd
Indirect (its electricity)
~7.9M gpd

No measured record exists, so this is a low-confidence model from 750 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
47
PM2.5
Good
44
O3
Good
18
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Jackson), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$21.2K
People of color
99%
Below poverty
55%
Tract population
3,421

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Canton Career Center in Canton, is 1.3 mi from this site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.