Amazon AWS PHL
1125 Electron Avenue · Berwick, Luzerne County, PA
Source: OpenStreetMap
Amazon AWS PHL is a mapped data center in Luzerne County, PA, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented 960 MW of reported power capacity and a 272,146 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkAmazon AWS PHL is a 272,146 square foot data center in Berwick, Luzerne County, Pennsylvania, currently mapped by DataCentersExposed. The site is operated by Amazon Data Services, Inc., whose ultimate corporate parent is Amazon.com, Inc. It draws power from PPL Electric Utilities Corp and sits within the PJM grid, and existing records describe it as an Amazon Web Services data center.
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon Data Services, Inc.
- This facilityAmazon AWS PHL
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Big Tech piles on $350 billion in debt to fuel AI data center raceLos Angeles Times· Jul 10, 2026
- Amazon's carbon emissions jumped 16% in 2025. The driver: massive data center buildoutKUOW· Jul 1, 2026
- 40 mayors worldwide endorse a pact to shape data center developmentSpectrum News· Jun 23, 2026
- Amazon donates $250K to Bloomsburg Area YMCA for new STEM lab as data center construction near Berwick continuesWNEP· Jun 9, 2026
- The data center regulation bills on the table in PASpotlight PA· May 18, 2026
- 'Many unanswered questions': Lawmakers announce Ohio Joint Data Center CommitteeSpectrum News· May 13, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's RTO pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
960 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Scranton and Wilkes-Barre), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Nescopeck El Sch in Nescopeck, is 4.4 mi from this site (156 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.