Dorrance Township Data Center
Mountain Top, Luzerne County, PA
Source: Primary source
Dorrance Township Data Center is a proposed data center in Luzerne County, PA, operated by Brewster Land Company, LLC. DataCentersExposed has documented a 918,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Luzerne, Pennsylvania
Dorrance Township Data Center in Mountain Top, PA is contested. Group: https://www.gofundme.com/f/support-our-fight-against-data-center-development Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkImported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asBrewster Land Company, LLC
- This facilityDorrance Township Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Dorrance Twp. supervisors take action to address data centersCitizens Voice· May 27, 2026
- Dorrance zoning board needs more time to rule on data center ordinanceCitizens Voice· Mar 31, 2026
- Rice Twp. receives grant to replace culvertHazleton Standard Speaker· Feb 1, 2026
- Mountain Top municipalities aim to regulate data centersHazleton Standard Speaker· Jan 11, 2026
- New Dollar General planned in Mountain TopHazleton Standard Speaker· Nov 9, 2025
- Plans for a data center at former Pennsylvania power station delayed by officialsData Center Dynamics· Oct 22, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Rice El Sch in Mountain Top, is 4.5 mi from this site (767 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.