Stack Data Center
Danville, Pittsylvania County, VA
Source: Primary source
Stack Data Center is a proposed data center in Pittsylvania County, VA, operated by Stack Infrastructure, Inc.. DataCentersExposed has documented 299 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkAnnounced investment: $73.5B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Ultimate parentStack Infrastructure, Inc.
- Files asStack Infrastructure, Inc.
- This facilityStack Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- No data center deal yet as Danville sets higher tax rate and weighs power needsWSET· May 21, 2026
- Stack commits $73.5bn investment into data center campus in Berry Hill, VirginiaData Center Dynamics· May 20, 2026
- Pittsylvania data center project approved with more investment and jobs than previously announced — as long as tax breaks remain in placeCardinal News· May 19, 2026
- Danville, Pittsylvania County leaders approve $100 billion data center investmentWSLS· May 18, 2026
- $100B data center project proposed at Berry Hill megasite advancesVirginia Business· May 18, 2026
- Berry Hill $100B AI Data Center Megaproject Advances After Key Local ApprovalConstruction Review· May 18, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Brosville Elementary in Danville, is 4.6 mi from this site (235 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.