Expedient Milwaukee

4777 West Ironwood Drive · Franklin, Milwaukee County, WI

Source: OpenStreetMap

Expedient Milwaukee is a mapped data center in Milwaukee County, WI, operated by Expedient, LLC. DataCentersExposed has documented 1.6 MW of reported power capacity and a 26,099 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Expedient, LLC
Operator
Expedient, LLC
Power
1.6 MW
Footprint
26,099 sq ft
Utility
Wisconsin Electric Power Co
Grid
MISO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

data center

Operator chain

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
24%
Fossil right now
62%
Grid operator
MISO
  • Natural Gas33.4%
  • Coal28.2%
  • Solar13.1%
  • Imports11.0%
  • Nuclear9.7%
  • Other3.0%
  • Wind1.6%

Real-time generation mix for the MISO grid this site draws from, as of Jul 15, 2026, 9:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
1.2 mi
Root River · 138 kV
Transmission line
0.6 mi
138 kV line
Municipal water
Served
Franklin Water Utility (modeled boundary)

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Wisconsin reported $40M in Qualified Data Centers sales/use tax exemption (Wis. Stat. § 77.54(70)) for FY2024 (Wisconsin Department of Revenue). Program-wide, not attributable to this site.

source · All Wisconsin subsidies →

Water use

Modeled estimate~83.2K gpd
Direct (onsite cooling)
~30.4K gpd
Indirect (its electricity)
~52.8K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.2 L/kWh cooling (cool climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
50
O3
Good
46
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Kenosha-Racine Lakeside), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$138.4K
People of color
19%
Below poverty
9%
Tract population
4,647

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Southwood Glen Elementary in Franklin, is 1.4 mi from this site (413 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.