Expedient Tidepoint is a mapped data center in Baltimore County, MD, operated by Expedient, LLC. DataCentersExposed has documented 1.5 MW of reported power capacity and a 23,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkExpedient Tidepoint is a mapped colocation data center in Baltimore County, Maryland, run by Expedient, LLC. The site draws power from Baltimore Gas & Electric Co inside the PJM grid. Ownership above Expedient is not detailed in available records.
Operator chain
- Ultimate parentExpedient, LLC
- Files asExpedient, LLC
- This facilityExpedient Tidepoint
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- What happens inside an Ohio data center?NBC4 WCMH-TV· Aug 10, 2026
- Wary of data center boom, Pittsburgh and Allegheny County proceed with cautionTribLIVE.com· Aug 2, 2026
- Local Maine officials look to pause data center development after state moratorium vetoRoute Fifty· May 20, 2026
- Data center in Columbus, Ohio, sold to occupierData Center Dynamics· Apr 30, 2026
- Comcast Business Launches Innovation Lab to Accelerate Enterprise AI & Hybrid InfrastructureThe Fast Mode· Apr 20, 2026
- Comcast Business Unveils Innovation Lab, Collaborating with Global Technology Leaders to Scale Next-Gen Enterprise SolutionsComcast Corporation· Apr 15, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's BGE pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
1.5 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Metro Baltimore), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Francis Scott Key Elementary/Middle in Baltimore, is 0.5 mi from this site (589 students). 4 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.