Skip to content
DataCentersExposed
County data-center profile

Spotsylvania County, Virginia

DataCentersExposed tracks 10 AI data centers in Spotsylvania County, Virginia — 2 operating and 8 in the pipeline, drawing 2.3 GW of reported power demand, led by Amazon.com, Inc.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
10
Operating
2
Pipeline
8

Reporting by · Updated May 29, 2026

Risk breakdown
20Low
  • Project exposure · 9
  • Power demand · 35
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Spotsylvania County

Facilities here with disclosed capacity draw 2.3 GW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Amazon.com, Inc. has the largest presence in Spotsylvania County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

10 facilities

Every tracked facility

FacilityOperatorStatusMW
SpotsyTech Campus
Spotsylvania Courthouse
Proposed800
Amazon Data Service: Orrock Rd
Woodford
Amazon.com, Inc.Proposed770
Gateway Commerce Center
Spotsylvania
Proposed
Hunter's Ridge South
Fredericksburg
AREP SOF III HRS LLC C/O AMERICAN REAL ESTATE PARTNERS, LLCProposed
Hunters Ridge LLC Data Center
Fredericksburg
Proposed
Summit Crossing Tech Campus
Fredericksburg
Proposed
Summit Technology Park
Fredericksburg
Proposed
AWS Spotsylvania Campus
Fredericksburg
Amazon.com, Inc.Under construction550
PowerHouse95
Fredericksburg
Operating150
Amazon Data Services INC. Iad450 Cosner Tech Campus
FREDERICKSBURG
Operating
Accountability

County commissioners

How the Spotsylvania County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.