Skip to content
DataCentersExposed
U.S. data-center footprint

Louisiana

DataCentersExposed tracks 14 AI data centers in Louisiana — 1 operating and 6 in the pipeline — across 7 counties, drawing 9.4 GW of reported power demand from 3 tracked corporate operators. State and local governments have granted those operators $3.3B in tracked tax abatements.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
14
data centers
Operating
1
live today
Pipeline
6
proposed / building
Demand
9.4 GW
6 w/ capacity
Counties
7
touched
Operators
3
corporate parents
The story so far

Louisiana at a glance

The largest footprint in Louisiana belongs to Meta Platforms, Inc., behind 2 tracked facilities. Applied Digital Corporation and Cogent Communications round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: East Baton Rouge County leads Louisiana with 1 facility and a composite risk score of 4/100. Richland County and West Feliciana County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Louisiana is not done growing. 6 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 1 state bill mentioning data centers and 6 recent news items are tracked for Louisiana below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in Louisiana

Identified abatements

Per-deal tax breaks on record

primary-source disclosures
$3.3B disclosed across 1 program
  • Louisiana data center sales/use tax exemption$3.3B

Specific incentive records we have matched in Louisiana (state certified-exemption lists, agreements, and disclosures) — most have no public per-site dollar value, so a count is shown rather than an invented figure.

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

14 of 14 shown

All tracked facilities

FacilityOperatorStatusCountyMW
River Bend Data Center CampusFluidstack, Anthropic, GoogleProposedWest Feliciana245
Shreveport Data CenterProposedCaddo
Meta Hyperion (Richland Parish)Facebook USA, Inc.Under constructionJones County5,000
Meta Louisiana Data CenterMeta Platforms, Inc.Under constructionRichland2,000
Hut 8 River BendHut 8Under constructionWest Feliciana Parish330
Applied Digital Delta Forge 1 (Boyce)Applied Digital CorporationUnder constructionRapides300
Meta RPL-10X Hyperion/Project SucreMeta Platforms, Inc.OperatingRichland1,500
Center for Computation & Technology (CCT)Mapped (unverified)East Baton Rouge
Cogent New OrleansCogent CommunicationsMapped (unverified)
DartPoints Baton Rouge, LA - BTR1Mapped (unverified)
DartPoints Baton Rouge, LA - BTR2Mapped (unverified)
DartPoints Shreveport, LA - SHV1Mapped (unverified)
MS Solar Grid DataBlockedOrleans
Venyu BTR1Mapped (unverified)

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.