U.S. data-center footprint
Delaware
DataCentersExposed tracks 2 AI data centers in Delaware — 0 operating and 0 in the pipeline — across 1 county, drawing 1.2 GW of reported power demand from 0 tracked corporate operators.
Sources: Methodology, Coverage scorecard
Reporting by Eric Keller · Updated May 29, 2026
Tracked
2
data centers
Operating
0
live today
Pipeline
0
proposed / building
Demand
1.2 GW
1 w/ capacity
Counties
1
touched
Operators
0
corporate parents
The story so far
Delaware at a glance
Geographically, the buildout clusters: New Castle County leads Delaware with 1 facility. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.
Where it's concentrated
County risk leaderboard
| County | Facilities | Pipeline | Risk |
|---|---|---|---|
| New Castle County | 1 | — | — |
2 of 2 shown
All tracked facilities
| Facility | Operator | Status | County | MW |
|---|---|---|---|---|
| Starwood Digital Ventures | — | Blocked | New Castle | 1,200 |
| IPR Wilmington CCC | — | Mapped (unverified) | — | — |