Starwood Digital Ventures
New Castle, New Castle County, DE
Source: Primary source
Starwood Digital Ventures is a blocked data center in New Castle County, DE. DataCentersExposed has documented 1,200 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkEnvironmnetal denial upheld in court Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Stellium Cuts 75% of Carbon Emissions in Newcastle FacilityData Centre Magazine· Jun 7, 2026
- Data center proposed for former Pitt Race ComplexNew Castle News· Jun 4, 2026
- $10 billion Hunter data centre to house Google and Microsoft informationNewcastle Herald· Jun 3, 2026
- New Castle Co. data center ordinance becomes lawWDEL· May 20, 2026
- Tax hike, library cuts, data center are topics of concern at New Castle County town hall meetingNewark Post· May 12, 2026
- New Castle approves data center zoning amendments as Frackville residents rallyThe Shenandoah Sentinel· May 5, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Wilbur (kathleen H.) Elementary in Bear, is 2.2 mi from this site (1,044 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.