Arkansas

DataCentersExposed tracks 15 AI data centers in Arkansas — 4 operating and 6 in the pipeline — across 8 counties, drawing 150 MW of reported power demand from 3 tracked corporate operators.

Sources: Methodology, Coverage scorecard

Reporting by · Updated May 29, 2026

Tracked
15
data centers
Operating
4
live today
Pipeline
6
proposed / building
Demand
150 MW
1 w/ capacity
Counties
8
touched
Operators
3
corporate parents
The story so far

Arkansas at a glance

The largest footprint in Arkansas belongs to Alphabet Inc., behind 1 tracked facility. Serverfarm and TierPoint, LLC round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Pulaski County leads Arkansas with 3 facilities and a composite risk score of 4/100. Benton County and White County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Arkansas is not done growing. 6 facilities are in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 2 state bills mentioning data centers and 6 recent news items are tracked for Arkansas below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in Arkansas

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

15 of 15 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Avaio Digital LeoAvaio DigitalProposedPulaski150
Clarksville Data CenterServerfarmProposedJohnson
Data centerWillowbend Capital LLCProposedPulaski
ForgeLight Ventures Data CenterForgeLight Ventures, LLCProposedFaulkner
Google West MemphisGoogle LLCUnder constructionCrittenden County
Groot LLC/ GoogleAlphabet Inc.Under constructionCrittenden
ARE-ON Forrest CityMapped (unverified)
ARE-ON HopeMapped (unverified)
Brightspeed Data CenterOperatingPope
Harrison Data CenterWindstreamOperatingBoone
Mainstream Little RockMapped (unverified)
OzarksGo FayettevilleMapped (unverified)
Searcy Information TechnologiesMapped (unverified)White
TierPoint Little RockTierPoint, LLCOperatingPulaski
Wal- Mart Stores, INC. - East Data CenterOperatingBENTON

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.