Skip to content
DataCentersExposed
Proposed

Data center

Little Rock, Pulaski County, AR

Source: Primary source

Data center is a proposed data center in Pulaski County, AR, operated by Willowbend Capital LLC.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Willowbend Capital LLC
Attribution & capacity confidence:mediumprimary source

Overview

source: link

$1B 300k sq ft data center proposed at Port of Little Rock; MoU approved with Willowbend Capital. End user reported as Google but not officially confirmed. Announced investment: $1.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
1.4 mi
Unknown121204 · 115 kV
Transmission line
991 ft
115 kV line
Municipal water
Served
Central Arkansas Water

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, College Station Elem. School in College Station, is 2.8 mi from this site (136 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.