Zayo Toulouse
Occitanie, France
Source: OpenStreetMap
Zayo Toulouse is a mapped data center in Occitanie, France, operated by Zayo. DataCentersExposed has documented a 8,290 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkZayo Toulouse is a mapped data center in France, operated by Zayo. Available records put its footprint at 8,290 square feet. No ultimate parent above Zayo is identified in the facts on hand, and the site is documented only as a Zayo data center.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Zayo Europe a ouvert un PoP compatible 400GE à RomeDCmag· Mar 4, 2026
- Euclyde Datacenter poursuit son développement en FranceTribuca· Oct 14, 2025
- Euclyde Datacenters rachète un centre de données en Île-de-FranceTribuca· Oct 12, 2025
- Castle-IT ouvre un data center en Indre-et-LoireDistributique· Dec 30, 2017
- Zayo fait l’acquisition du datacenter de Green Data Center 1 à Vélizy-VillacoublayChannelNews· Mar 6, 2017
- Data center : « On veut savoir qui a fait quoi en cas d'attaque informatique ou d'incendie »Le Parisien· Feb 20, 2017