Cogent Toulouse
Occitanie, France
Source: OpenStreetMap
Cogent Toulouse is a mapped data center in Occitanie, France, operated by Cogent Communications. DataCentersExposed has documented a 7,189 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkCogent Toulouse is a mapped data center in France, operated by Cogent Communications. Records describe it as a Cogent data center with a footprint of 7,189 square feet. No ultimate parent above Cogent Communications is disclosed in available records.
Operator chain
- Ultimate parentCogent Communications
- Files asCogent Communications
- This facilityCogent Toulouse
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- I Squared mise sur l'inférence IA en rachetant un centre de données à Cogent pour 225 millions de dollarsBoursorama· May 26, 2026
- Data centers : La consommation électrique explose en France avec l’IA, malgré une amélioration de l’efficacité énergétiqueL'Usine Digitale· May 22, 2026
- CCOI: On-net and wavelength growth offset Sprint declines, with data center sales fueling deleveringTradingView· May 4, 2026
- Analyse de la taille, de la part et de la croissance du marché de la colocation de centres de données - 2032Global Market Insights Inc.· Jun 2, 2024
- Les 5 plus gros datacenters français vus par Google EarthZDNET· Feb 27, 2019
- Castle-IT ouvre un data center en Indre-et-LoireDistributique· Dec 30, 2017