Mapped (unverified)colocation
Woluwedal 102
Sint-Lambrechts-Woluwe, Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest, Belgium
Source: Primary source
Woluwedal 102 is a mapped data center in Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest, Belgium. It runs on Belgium's grid, which was 20% fossil-fuelled at 133 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
133 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest
Overview
source: linkUpgrade Estate — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
133 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.
In the news
source: Google News (local + English)- Data-analist: 'Brussel is te sterk afhankelijk van Microsoft en Google'BRUZZ· Mar 19, 2025
- Bevolkingsaantal in Brussel was nog nooit zo hoogDe Standaard· Nov 7, 2024
- Interxion sluit datacenter in Belgiëcomputable.be· Aug 11, 2022
- Gezin met baby moet weg uit huisje van 16 vierkante meterDe Standaard· Aug 20, 2020
- ‘Trouwen is houden: daar lach je niet mee’De Standaard· Sep 22, 2017
- Prins Laurent in kunstmatige coma gehoudenDe Standaard· Mar 26, 2014
See something wrong or missing on this page? Suggest a correction.