Mapped (unverified)colocation
VERIXI Louise DC
Brussels, Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest, Belgium
Source: Primary source
VERIXI Louise DC is a mapped data center in Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest, Belgium. It runs on Belgium's grid, which was 20% fossil-fuelled at 133 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
133 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest
Overview
source: linkVERIXI SA — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
133 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.
In the news
source: Google News (local + English)- Brussel wil meebetalen aan gigantische Rotterdamse AI-fabriek, maar Den Haag niet: ‘Dit is onbegrijpelijk’AD.nl· Aug 3, 2026
- AI-fabrieken moeten onafhankelijkheid EU versterkenTrouw· Jul 31, 2026
- Brussel zet zeilen bij uit angst voor technologische dominantie door VSHet Financieele Dagblad· Jun 3, 2026
- EU wil géén ‘digitale kolonie’ zijn en zet in op open source en datacenters voor eigen cloud en AI-ontwikkelingNRC - Nieuws, achtergronden en onderzoeksjournalistiek· Jun 1, 2026
- Live In het kort: nieuwsblog: Nooit eerder werden zoveel EPC-deskundigen geschorstTrends.be· Jun 1, 2026
- VIDEO Europa wil meer datacenters, maar kan ons elektriciteitsnetwerk dat wel aan?VRT· May 27, 2026
See something wrong or missing on this page? Suggest a correction.