VERIXI Louise DC
Brussels, Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest, Belgium
Source: Primary source
VERIXI Louise DC is a mapped data center in Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest, Belgium. It runs on Belgium's grid, which was 20% fossil-fuelled at 109 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
109 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Région de Bruxelles-Capitale - Brussels Hoofdstedelijk Gewest
Overview
source: linkVERIXI SA — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
109 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.
In the news
source: Google News (local + English)- Brussel zet zeilen bij uit angst voor technologische dominantie door VSHet Financieele Dagblad· Jun 3, 2026
- EU wil géén ‘digitale kolonie’ zijn en zet in op open source en datacenters voor eigen cloud en AI-ontwikkelingNRC· Jun 1, 2026
- Nederlandse Soevereine Datacenter Coöperatie: Het kan wélDutch IT Leaders· May 31, 2026
- Volle Europese datacentermarkten duwen investeerders richting BelgiëTrends.be· May 22, 2026
- Luk Van Soom tovert datacenter om tot droomlandschap: “In een museum is mijn werk zichtbaar voor een beperkt publiek, hier zien dagelijks duizenden automobilisten het”Nieuwsblad· Apr 1, 2026
- Activisten protesteren in hartje Brussel tegen vergunningen voor datacentersBRUZZ· Mar 25, 2026
See something wrong or missing on this page? Suggest a correction.