Mapped (unverified)colocation
Verizon Madrid
Madrid, Comunidad de Madrid, Spain
Source: Primary source
Verizon Madrid is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkVerizon Communications, Inc. — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Andalucía aún no sube a la nube: solo un tercio de las empresas contrata servicios 'cloud'El Conciso· Jun 20, 2026
- Una "gigafactoría de IA" entre Madrid y Tarragona suena muy bien: cuando miras la letra pequeña, no tantoXataka· Jun 16, 2026
- Madrid, entre los principales nuevos mercados de inversión en centros de datos en EMEAIdealista· Jun 16, 2026
- El Gobierno aprueba la inversión de 719 millones de euros para impulsar la gigafactoría europea de IA en San Fernando de Henares y TarragonaEl Periódico de España· Jun 16, 2026
- De Tierra de Olivos a gigante digital: un pueblo de 10.000 habitantes de Toledo acogerá un megacentro de datos de 3.000 millonesEl Economista· Jun 11, 2026
- Unicaja impulsará su transformación tecnológica con un centro de datos en Madrid y un hub en MálagaRevista Capital· Jun 5, 2026
See something wrong or missing on this page? Suggest a correction.