Mapped (unverified)colocation
Adam - MAD
Alcalá de Henares, Comunidad de Madrid, Spain
Source: Primary source
Adam - MAD is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkADAM — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Dentro de la infraestructura crítica más vigilada y blindada de España: así funciona un centro de datosVozpopuli· Oct 5, 2026
- Madrid ya suma 17 centros de datos, pero la capacidad de la red eléctrica condiciona su crecimientoMadridinforma· Sep 29, 2026
- Nabiax invertirá casi 800 millones en su nuevo centro de datos en Alcalá de Henares (Madrid)Brains Real Estate News· Sep 21, 2026
- Nabiax inicia la construcción de su nuevo centro de datos en Alcalá de HenaresMuyCanal· Sep 21, 2026
- ALCALÁ DE HENARES | Ayuso colocó la primera piedra del nuevo centro de datos de Alcalá construido por NabiaxSoy de Madrid· Sep 21, 2026
- Miguel López-Valverde: "El Corredor del Henares es una de las zonas más atractivas para el sector de los centros de datos"El Periódico de España· Sep 21, 2026