Mapped (unverified)colocation
Adam - MAD
Alcalá de Henares, Comunidad de Madrid, Spain
Source: Primary source
Adam - MAD is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkADAM — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Lo que ocultan los centros de datoslamarea.com· Aug 5, 2026
- Nabiax invertirá 800 millones en la ampliación de sus centros de datos en EspañaCinco Días· Aug 4, 2026
- Pablo Ruiz-Escribano (Nabiax): "Queremos alojar a los hiperescalares en nuestros centros de datos de Madrid"El Español· Aug 4, 2026
- Alcalá de Henares, epicentro de la nueva ‘colonización’ de los centros de datoslamarea.com· Aug 3, 2026
- Así es el Alcalá Data Center, la infraestructura que blinda la España digitalEscudo Digital· Jul 22, 2026
- ACS, Ferrovial y Merlin lanzan la inversión en centros de datos en la Comunidad de Madrid por encima de los 6.000 millonesEconomía Digital· Jul 12, 2026
See something wrong or missing on this page? Suggest a correction.