Vantage WA12
Grant County, WA
Source: OpenStreetMap
Vantage WA12 is a mapped data center in Grant County, WA, operated by Vantage Data Centers Holdings, LLC. DataCentersExposed has documented a 124,695 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
Operator chain
- Ultimate parentVantage Data Centers Holdings, LLC
- Files asVantage Data Centers Holdings, LLC
- This facilityVantage WA12
In the news
source: Google News- After Virginia approved a gas-powered data center without public input, residents turned to a local environmental group for answersDC News Now· Jun 9, 2026
- Malaysia’s AI data centre boom enters mission-critical phaseThe Malaysian Reserve· Jun 2, 2026
- Poland Data Center Market Investment Analysis Report 2026-2031 Featuring Atman, Beyond.pl, Data4, Equinix, Netia, Orange Business, Polcom, T-Mobile, Vantage Data Centers, and 3S GroupYahoo Finance· May 14, 2026
- Wisconsin utility company executive says more data centers could be on the horizonWPR· May 7, 2026
- Amid ‘constant' data center noise, Sterling residents also worry about health impactNBC4 Washington· Apr 15, 2026
- Wisconsin town revolts against a Trump-backed data center projectPolitico· Apr 7, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Vantage Data Centers Holdings, LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2021 · term — yr · source
Washington reported $100.1M in Data center equipment and infrastructure sales/use tax exemption — rural counties (RCW 82.08.986 / 82.12.986) for FY2024 (Washington State Department of Revenue). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Quincy High School in Quincy, is 1.8 mi from this site (895 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.