Vantage WA11
Grant County, WA
Source: OpenStreetMap
Vantage WA11 is a mapped data center in Grant County, WA, operated by Vantage Data Centers Holdings, LLC. DataCentersExposed has documented a 147,430 sq ft footprint at this site.
Reporting by Eric Keller · Updated Aug 27, 2026
Overview
source: linkdata center
Operator chain
- Ultimate parentVantage Data Centers Holdings, LLC
- Files asVantage Data Centers Holdings, LLC
- This facilityVantage WA11
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Crow and CleanArc target 245MW data center at Dallas Market Center in TexasData Center Dynamics· Aug 3, 2026
- China's Huawei launches 4 AI data center power & cooling solutions in MalaysiaTNGlobal· Aug 3, 2026
- APAC Data Centre Pipeline Hits 25.5GW as Delivery Risk Eclipses Demand Concerns: SavillsMingtiandi· Jul 30, 2026
- Vantage explores $2bn-plus sale of Malaysian data centre assets – reportInvestment Monitor· Jul 29, 2026
- Vantage said to mull US$2 bil data centre sale in Malaysia — BloombergThe Edge Malaysia· Jul 29, 2026
- AirTrunk, Vantage make multibillion-dollar data centre moves in MalaysiaFree Malaysia Today· Jul 29, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Washington reported $100.1M in Data center equipment and infrastructure sales/use tax exemption — rural counties (RCW 82.08.986 / 82.12.986) for FY2024 (Washington State Department of Revenue). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Quincy High School in Quincy, is 1.6 mi from this site (895 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.