Upper Macungie Data Center
Upper Macungie, Lehigh County, PA
Source: Primary source
Upper Macungie Data Center is a blocked data center in Lehigh County, PA. DataCentersExposed has documented a 2,600,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Lehigh, Pennsylvania
Upper Macungie Data Center in Upper Macungie, PA is contested. Opposition reported. Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkDeal not finished yet, Air Products still owns land Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Plans to turn former corporate campus into data center hub are dead in Lehigh CountyLehighValleyLive.com· Aug 12, 2026
- A developer is officially ending plans for a major Lehigh Valley data center projectThe Morning Call· Aug 11, 2026
- Developer ends data center project at Air Products’ former Upper Macungie headquartersWFMZ.com· Aug 11, 2026
- With Upper Macungie's rejection of data center official, the clock is ticking. Will Air Products appeal?WFMZ.com· Jul 14, 2026
- Lehigh Valley data centers: Where they’re proposed, and where those plans standThe Morning Call· Jul 8, 2026
- Lehigh Valley state senator urges residents to keep up data center fight. ‘There’s power in numbers.’The Morning Call· Jun 11, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Fred J. Jaindl El Sch in Breinigsville, is 1.1 mi from this site (447 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.