Allentown-TekPark
Lehigh County, PA
Source: OpenStreetMap
Allentown-TekPark is an operating data center in Lehigh County, PA, operated by TierPoint, LLC. DataCentersExposed has documented a 146,248 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
Operator chain
- Ultimate parentTierPoint, LLC
- Files asTierPoint, LLC
- This facilityAllentown-TekPark
In the news
source: Google News- TierPoint CEO Jerry Kent to step down, company on hunt for new chief execData Center Dynamics· Mar 31, 2026
- TierPoint Initiates Search for Next CEOThe Manila Times· Mar 31, 2026
- Amid Sioux Falls proposal, where are South Dakota's data centers?Argus Leader· Mar 3, 2026
- New owner plans data center expansion at Tek ParkLehigh Valley Business· Dec 17, 2025
- A data center company bought a Lehigh Valley industrial park for $175 million, plans expansionThe Morning Call· Dec 16, 2025
- Argo Infrastructure Partners Increases TierPoint Stake As Total Capital Formation Reaches $3 BillionPulse 2.0· Dec 14, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's RTO pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~25 to 60 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Lehigh Valley), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Veterans Memorial El Sch in Breinigsville, is 1.1 mi from this site (517 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.